News

Arua City officials inspect roads, identify gaps requiring urgent attention

Among the key issues discovered are: narrow size of the already maintained roads, which is contrary to the standard planned size, poor drainage system maintenance, lack of marram on the maintained roads, narrow culverts and use of muddy soils to construct instead of prequalified sand for the construction of culverts.

Arua City is concluding the maintenance of roads under the sh1b road maintenance fund and additional sh299m under the Uganda Road Fund. (File)
By: Robert Ariaka, Journalist @New Vision

_________________

A select team of Arua City officials on Friday, July 10, 2026, joined by the Office of the Resident City Commissioner (RCC), inspected and supervised several roads in the city, with numerous gaps discovered that need to be fixed.

Among the key issues discovered are: narrow size of the already maintained roads, which is contrary to the standard planned size, poor drainage system maintenance, lack of marram on the maintained roads, narrow culverts and use of muddy soils to construct instead of prequalified sand for the construction of culverts.

Arua City is concluding the maintenance of roads under the sh1b road maintenance fund and additional sh299m under the Uganda Road Fund.

Speaking after the road inspection and monitoring, the Mayor of Ayivu Division, Malon Avutia, challenged the Arua City engineering department to ensure the roads maintain their original state to avoid future incumbrances.



Mary Dawaru, the senior environment officer, Ayivu Division in Arua City, says most of the roads have standard measurements that should be followed.



Meanwhile, Bernard Abima, an engineer in Arua City who led the team for the road monitoring and inspection, said that where there is no challenge from the community, the roads are opened to the standard, but where the community raises complaints, the size is affected.



The Deputy RCC Ayivu Division, Jona Mbigiti, said Arua City needs wider and better roads.



Arua City in the financial year 2025/2026 received sh1b under road maintenance and sh299m under the Uganda Road Fund.

Help us improve! We're always striving to create great content. Share your thoughts on this article and rate it below.

Tags:
Arua City
Roads
Inspection